I’m feeling unsure of what to do: I’ve been working on my shed foundation and floor. Due to the slope in my backyard, I used concrete piers with wet set j bolts and post bases. I set my beams in the post bases and using joists to frame out the floor. I just bolted up my beams and rim joists and rechecked square and my diagonals are out of square by two inches!!! The lengths have been verified. Because everything is anchored down, I can’t just use a hammer to knock it into square.
Any suggestions? If I proceed forward, will that just be an absolute headache?